The original house was built in the 1970’s, a Three Bed double fronted Detached House. MLS completed a Garage Conversion in 2017 and were delighted to be invited to install a new Kitchen for the same client.

Kitchen Refurbishment Chorley

More Living Space installed the new Kitchen and created a walk through Kitchen Dining Room to a very a high specification providing additional Living Space. The build specification included Laminate Floor, Decoration, Solid Wood Internal Doors, Granite Worktops and a Howdens Kitchen. This high-quality Kitchen has added extra quality to this family home, a statement of quality and style. The Refurbishment includes Dry Lining/Skirting/Lighting in the Conservatory new internal feature Doors and Quick Step Laminate Flooring.

This construction project by More Living Space in Chorley had the following Key items;

  • Laminate Floor
  • Plinth Lights
  • LED Cupboard Lighting
  • AEG Appliances
  • Neff Cooker extractor
  • Quartz Worktops with upstands
  • New wall linings built with CLS Timber (high-quality Kiln dried Timber
  • New Radiators
  • Double feature Doors
  • Stainless Steel Windermere Sink
  • Fully decorated – as per customers specification
  • Double Oak Doors
  • Howdens Clerkenwell Gloss Cashmere

More Living Space specialise in all types of construction projects, this particular project in Chorley was undertaken and completed in 15 working days, the internal fittings and finishes were of a high-quality finish, the Garage Conversion provided a High-Quality Living Space.

Customer Feedback

Customer was very pleased with the transformation, the MLS customer testimonial is included as part of this case study.

Construction Promise

  1. More Living Space will manage and advise on every aspect, including any Structural changes, Wall Linings, Plumbing, Electrics, Decoration,
    and Flooring.
  2. More Living Space Garage are fully compliant with Building Regulations, home owners receive certification for Electrical, Gas or Building Regulation compliance.
Meeting Building Regulations
  1. More Living Space Garage Contracts include Building Regulations compliance with a completion certificate and electrical Part “P” compliance certificate. Any changes to Gas supply pipes will be certificated by a fully qualified Gas Safe installer.
  2. All contracts are based on a 25% deposit payment, this can be made by Credit Card (Visa/Mastercard) MasterCard/American Express) without any surcharge.
  3. A fixed start date and completion date are integral to all More Living Space Garage Conversions, most are completed in 10 Days (Two Weeks)
  4. MLS can advise on all types of new features, find ideas on creating; Granny Flats, Kitchens, Bathrooms, En-suites, Study, Bedrooms, Living Rooms, Extended Hallways, Cinema Rooms, Garden Rooms.
Start Planning Your Garage Conversion